Project references

Trusted where downtime isn't an option

Recent works span Alexandra Hospital, Tan Tock Seng Hospital, National University Hospital, Equinix, the Civil Aviation Authority of Singapore and Resorts World Sentosa — environments where cooling is mission-critical.

Featured

Latest projects

Client
National Healthcare Group
Sector
Healthcare

Chiller Plant Addition & Replacement

Alexandra Hospital

  • Construction of new chiller plant
  • Extension of plant room
  • Laying of underground cables from HT
  • Installation of additional chiller
  • Replacement of all existing chillers
  • Replacement of chiller pumps
Chiller plant room during plant replacement works
Underground high-tension cable trench on a live hospital site
Mini excavator clearing ground for the new chiller plant, bulk bags of spoil stacked behind
Workers placing concrete against timber formwork for the plant's retaining wall
Crew pouring and levelling the concrete slab for the new plant beside the existing chillers
Plate compactor levelling the base of the underground cable trench
Team hauling high-tension cable by hand along the hospital service road
High-tension cables laid in a galvanised overhead cable tray
New chiller units in timber crates inside the fenced plant area, under a temporary tarp
Crew guiding a crane-slung Daikin chiller onto its concrete plinth
Wrapped Daikin chiller set down on its new plinth beside an installed unit
Chiller lifted by mobile crane over the hospital chiller plant
Chiller suspended from the crane against the plant's green noise barrier
Chilled-water pipework being connected in the new plant, chiller covered in a blue tarp
Completed chiller plant with blue chilled-water pipework, seen from the access stairs
Completed fenced compound of air-cooled units with chilled-water pipework overhead
Gated entrance to the chiller plant compound at Block 26E
Client
National Healthcare Group
Sector
Healthcare

Air Handling Unit Replacement

Alexandra Hospital

  • Construction of platform for new AHU entry
  • Replacement of AHU
  • Replacement of control panel
  • Modification and replacement of supply/return duct
New air handling unit installed in the plant room, access doors and inspection window visible
New air handling unit slung from a crane during delivery to site
Crew in hard hats guiding a shrink-wrapped AHU off a lorry crane beside the hospital block
Galvanised steel access platform being built against the plant building for the new AHU entry
Four new air handling units, shrink-wrapped and labelled, staged outside the plant room
Opening cut through the plant room wall under a new metal canopy, worker clearing debris inside
New AHU base frame and fan section being assembled in the plant room among insulated ductwork
Installed air handling unit with chilled-water pipework and flexible connectors fitted
Completed AHU plant room with the new unit, control panel and insulated chilled-water pipework
Client
Pro-Matrix Pte Ltd
Sector
Data Centre

Supply and Return Ductwork for Chilled-Water Equipment

Data Centre

  • Installation of new supply/return duct for all CHW equipment
  • Installation of duct for mechanical ventilation system
CRAC units below overhead containment, chilled-water pipework and busduct in a data centre plant room

More from this project

Insulated supply and return ducts branching overhead
Supply air ductwork running to ceiling diffusers
Insulated return air ductwork routed at high level
Exhaust air ductwork with inline fans mounted in the run
Inline fans and attenuators fitted to the ductwork
Busduct running alongside exhaust ductwork at ceiling level
Cable ladders and ductwork sharing an overhead services route
Ceiling-level services with return air grilles
Wide view of overhead ductwork, containment and lighting
Services corridor with ductwork and pipework overhead

Past & present references

Selected projects, 2023–2026

Customer Scope Sector
Certis Cisco Institute of Mental Health Healthcare
CoreBPM Pte Ltd Emerald Hill Commercial & F&B
Daikin Singapore Pte Ltd Daikin HQ Singapore Commercial & F&B
Engie ITS CMI DC — Chilled Water Pipework Modification for Redundancy Data Centre
Engie ITS Nanyang Polytechnic Institutional & Government
Engie ITS Nanyang Technological University Institutional & Government
Globalwide Tan Tock Seng Hospital — CT Scan Room Healthcare
INN Interior Alexandra Hospital — GSC & ASW (ACMV) Healthcare
National Healthcare Group Additional & Replacement of Chillers Healthcare
National Healthcare Group Air Handling Unit Replacement Healthcare
NCS Communications Eng Pte Ltd Civil Aviation Authority of Singapore (ACMV) Institutional & Government
Pro-Matrix Pte Ltd CPF Tampines (ACMV) Institutional & Government
Pro-Matrix Pte Ltd Equinix (Cooling Tower — EC Fans) Data Centre
Pro-Matrix Pte Ltd Genesis DC — CRAC Replacement Data Centre
Pro-Matrix Pte Ltd Immigration & Checkpoints Authority (ACMV) Institutional & Government
Pro-Matrix Pte Ltd Keppel DC — Geras 2 Data Centre
Resorts World Sentosa Exhaust Fan Replacement, Universal Studios Singapore & Casino Commercial & F&B
Resorts World Sentosa Mechanical Ventilation Fan Installation Commercial & F&B
Siemens Pte Ltd SingPost (EV Charging Station) Energy & EV

Healthcare

Hospital and clinic works

Project
Alexandra Hospital — Chiller Addition & Replacement
Alexandra Hospital — AHU Replacement
Alexandra Hospital — Ambulance Surgical Ward
Tan Tock Seng Hospital — AMK Preventive Healthcare Centre
Tan Tock Seng Hospital — CT Scan Room
Alexandra Hospital — General Surgery Clinic
Tan Tock Seng Hospital — Ren Ci
Jurong Healthcare Campus — HR Office
NUH — Centre of Interventional Psychiatry
NUH — Kent Ridge Office of Innovation
NUH — Pre-Implementation Genetic Diagnosis Centre
NUH — Rehabilitation Staff Area

Tell us about the building

Send drawings or a short brief and we'll come back with a site walk-through and a considered proposal.

Contact Us